Projects

Puerto Maldonado Sanitation APP

Country
Peru
Client
PROINVERSION
Amount
M USD 592.0
Reach
Integrated sanitation project in Puerto Maldonado, including the design, financing, construction and operation of the system for 25 years, comprising 160 km of sewerage networks, five pumping stations and a wastewater treatment plant with a capacity of 400 l/s, serving an estimated population of 200,000 inhabitants.
water, peru

La Atarjea Wastewater treatment plant

Country
Peru
Client
SEDAPAL - Servicio de agua potable y alcantarillado de Lima
Amount
USD 195.0 M
Reach
Design, engineering, construction, supply, operation and maintenance of the La Atarjea wastewater treatment plant; to provide approximate coverage for 500,000 inhabitants.
water, peru

Educational Centers APP

Country
Uruguay
Client
INAU
Amount
USD 188,0 M
Reach
Financing, design, construction, equipment and operation of several services of 27 children education centers and 15 schools, distributed throughout the Uruguayan territory. 30 months construction and equipment period plus 20 years of operation.
education, uruguay

Central Panama Water sanitation network

Country
Panama
Client
MINSA-UCP
Amount
USD 150.5 M
Reach
Operation and maintenance with design and construction of the necessary solutions for the optimization of the sanitation in Central Panama that includes primary collectors, secondary networks, wastewater treatment plants, pumping stations, septic tanks and chimneys; for a period of 5 years; to provide approximate coverage for 1.5 million inhabitants.
water, panama

Montegrande Aqueduct

Country
Dominican Republic
Client
INDRHI - Instituto Nacional de Recursos Hídricos
Amount
USD 139.9 M
Reach
Design and construction of multipurpose hydraulic infrastructure, aimed at mitigating flood damage and strengthening water supply. The project includes the installation of a 23 km aqueduct for potable water, as well as an irrigation network composed of 34 km of closed pipeline and 24 km of open canal.
water, dominican republic

Enrique Ortega Water treatment plant

Country
Puerto Rico
Client
PRASA – Puerto Rico Aqueduct and Sewer Authority
Amount
USD 136,8 M
Reach
Construction and rehabilitation of the Enrique Ortega potable water treatment plant in Toa Alta; to provide approximate coverage for 1.0 million inhabitants.
water, puerto rico

East Arraiján Wastewater treatment plant

Country
Panama
Client
MINSA-UCP
Amount
USD 102.8 M
Reach
Design, engineering, construction, supply, operation and maintenance of the Arraiján sewage network, includes wastewater treatment plant, pumping stations, primary collectors and interconnections with existing networks; to provide approximate coverage for 200,000 inhabitants.
water, panama

Culebrinas Water treatment plant

Country
Puerto Rico
Client
PRASA – Puerto Rico Aqueduct and Sewer Authority
Amount
USD 94,3 M
Reach
Construction and rehabilitation of the Culebrinas potable water treatment plant in Aguadilla; to provide approximate coverage for 150,000 inhabitants.
water, puerto rico

Water Loss Reduction Program in the Torogoz System

Country
El Salvador
Client
ANDA - Administración Nacional de Acueductos y Alcantarillados
Amount
USD 73.5 M
Reach
Integrated water loss reduction program in the Torogoz System, including mass metering, hydraulic sectorization, rehabilitation of existing infrastructure and operational improvements, aimed at increasing the efficiency of the main water supply system of the San Salvador Metropolitan Area, which serves more than 1,000,000 inhabitants.
water, El Salvador
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.